01

Preparation works:  Drill and clean out holes.

 

Installation of Diffused Chemical Damp Proof Course to stop Rising Damp.

02

Tanking

Preparation works: Clean and apply cementitious tanking slurry.

​

Installation of new generation impervious tanking to the floor of a Sun Room.

5B639E73-C5F0-443E-8680-A7686FA3276C.heic
394675A5-4DBB-4713-83C6-9204CFC89519.heic

03

Membranes 

Preparation works: Clean walls and floor to stop any blockages.

​

Installation of a high quality damp proof membrane with venting properties to allow water and air movement under the finished floor.

04

Preparation works: Cover and protect any windows, wooden frames and doors.

​

Removal of numerous modern paint coats that contain Acrylic, a type of Thermoplastic which creates a plastic wrapping effect over the building

7F1FF364-BA57-4192-9268-77ECAB06DA62.heic