top of page
01
Preparation works: Drill and clean out holes.
Installation of Diffused Chemical Damp Proof Course to stop Rising Damp.
02
Tanking
Preparation works: Clean and apply cementitious tanking slurry.
​
Installation of new generation impervious tanking to the floor of a Sun Room.
03
Membranes
Preparation works: Clean walls and floor to stop any blockages.
​
Installation of a high quality damp proof membrane with venting properties to allow water and air movement under the finished floor.
04
Preparation works: Cover and protect any windows, wooden frames and doors.
​
Removal of numerous modern paint coats that contain Acrylic, a type of Thermoplastic which creates a plastic wrapping effect over the building
Est. 1979
bottom of page